Design Build

Glenmore Distillery

SKY Engineering was hired, directly by the owner, to perform a feasibility study on the existing HVAC system for the main production / office complex, while checking the current capabilities of the existing system. We located any system deficiencies and recommended any required changes to mitigate found issues. We were then hired to design the new VRF system to accommodate for the much needed office renovation and rework the existing HVAC system, as needed, for the renovated space.

Scope of Work

01

Mechanical HVAC