Uncategorized

World Wide Technologies

The owner had multiple types of HVAC systems serving their entire building, that ranged from a 2-pipe boiler and chiller system, mini-splits, and a 16-ton VRF system. We were hired to provide and oversee the design and construction of the MEP renovation to include replacement of the existing HVAC systems with new Conventional Splits System and Package Rooftops Units. We also reworked power distributions for the new systems, along with replacement of lighting with new LED efficient fixtures.

Scope of Work

01

Mechanical Design

02

Plumbing Design